WARNING: Lifting the pedestal, the cabinet, or the complete terminal, requires two or three persons due to the heavy weights. |
WARNING: Before the terminal has been secured to the foundation, there is a risk of the terminal tipping forward, especially when you open the cabinet door. |
•Place the terminal at the site that has been prepared. see Site preparations for instructions.
•Fasten the terminal with 4–8 expansion screws or mount the terminal on an existing base anchor or similar using the appropriate nuts and washers.
Important: The function of the coin system and the water drainage (door shelf) may be interrupted if the terminal leans more than a couple of degrees in any direction. |