Show/Hide Toolbars

CWT Compact S2 Installation & Maintenance Manual

Navigation: Installation

Installing the terminal

Scroll Prev Top Next More

Due to its heavy weight the terminal is usually transported in two pieces to the installation site where the pedestal is secured to a concrete base or floor before the cabinet is mounted on top of the pedestal.

Provided there is an appropriate lifting device or a hand cart at hand, the entire terminal can be installed as a complete unit.

 

In this chapter

Mounting the pedestal in its foundation

Mounting the cabinet on top of the pedestal

Installing the battery

Connecting to the mains power grid

Loading paper in a GeBe printer

Installing the coin box